visit_church_hill

CAR has full slate of new construction and rehab projects this month

10/15/2016 5:14 PM by

The agenda for Tuesday, October 25, 2016 meeting of the Commission of Architectural Review includes a number of local projects:

  • 2423 E. Grace St. – Remove eastern handrail on 1st story of the rear porch and install lattice to the height of 5′-10″.
  • 512 N. 29th St. – Rehabilitate the existing home to include replacing vinyl siding with fiber cement siding, painting, and installing a new front door.
  • 700 N. 27th St. – Construct a garage, a pergola, a deck, and an addition to an existing structure; repaint the existing structure; and replace the existing fences.
  • 970-972 Pink St. – Rehabilitate the existing structure and construct a two story rear addition.
  • 705 N. 23rd St. – Rehabilitate the existing structure to include painting and replacement of all windows.
  • 2432-2438 Venable St. – Demolish a small retaining wall, grade lot, construct a block wall, and paint over an existing mural with red brick colored paint.
  • 720 Jessamine St. – Construct a new duplex.
  • 3005-3007 E. Franklin St. – Rehabilitate a multifamily building and construct a new multifamily building.
  • 2107 Cedar St. – Rehabilitate an existing structure to include new windows, doors, siding, and roof and construct a two story addition and deck at the rear.
  • 604 N. 22nd St. – Construct a garage at the rear of the property.
  • 3112 E. Marshall St. – Construct a new three story single family dwelling.

— ∮∮∮ —

970-972 Pink Street

970-972 Pink Street

— ∮∮∮ —

3112 East Marshall Street

3112 East Marshall Street

— ∮∮∮ —

720 Jessamine Street

720 Jessamine Street

— ∮∮∮ —

2107 Cedar Street

2107 Cedar Street


TAGGED: ,

15 RESPONSES

Leave a Reply

Your email address will not be published. Required fields are marked *