visit_church_hill

Two big Union Hill projects before CAR this month

02/18/2017 8:21 AM by

The agenda for the February 28 meeting of the Commission of Architectural Review has a slew of local projects, including two big ones in Union Hill:

  • 816 N 23RD ST – Replace front and back door
  • 701 MOSBY ST – Open bricked in openings and restore doors
  • 717 N 24TH ST – Remove vinyl siding, storm door, and awnings, restore wood siding on front elevation, install fiber cement siding on secondary elevation
  • 2405 & 2407 CEDAR ST – Remove vinyl siding, replace with hardiplank, restore wood siding on front elevation if possible
  • 2230 VENABLE ST – Construct five new multifamily structures
  • 517 N 29TH ST – Replace porch decking, railing, roofing, soffit and gutter
  • 902 N 25TH ST – Construct new two story porch in rear, one story entry porch, and add fiber cement siding
  • 811 JESSAMINE ST – Replace windows and remove chimney
  • 812 JESSAMINE ST – Replace porch decking, railing, and columns
  • 125 N 25TH ST – Modification to previously approved plans to include the demolition of existing addition and construction of new addition
  • 533 Mosby Street – Construct Construct a new single family dwelling and a garage.
  • 2411 M ST – Construct a new 3 story mixed use building with an enclosed rooftop amenity room and terraces
  • 813 N 24TH ST – Construct one single family dwelling on vacant lot

— ∮∮∮ —

2411 M Street

— ∮∮∮ —

701 Mosby Street

— ∮∮∮ —

2230 Venable Street


TAGGED: , , ,

15 RESPONSES



Leave a Reply

Your email address will not be published. Required fields are marked *