visit_church_hill

CAR to consider 4 new houses, rehab on Carrington Street

05/12/2017 12:58 PM by

The agenda for the May 23 meeting of the Commission of Architectural Review has a slew of local projects:

  • 214 North 26th Street – Replace existing rear deck with a new deck.
  • 3416 East Marshall – Install wood handrail.
  • 9 North 29th Street – Replace concrete walkway and steps with brick.
  • 501 North 25th Street – Install fiber cement sidings on all sides of the existing structure.
  • 2602 East Franklin Street – Construct a new shed.
  • 717 North 24th Street – Rehabilitate attached single family home and construct a new rear addition.
  • 821 North 24th Street – Construct a new duplex.
  • 2310 Venable Street – Construct a new duplex.
  • 966-968 Pink Street – Construct a new duplex.
  • 2805 East Clay Street – Install Fiber Cement siding and replace windows on the facade.
  • 616 North 25th Street – Rehabilitate front and rear porchs of a residential structure and construct a new rear deck.
  • 412 North 26th Street – Replace siding and windows, repair porch, construct new garage, and construct a side addition.
  • 713 North 24th Street – Construct a new attached single family home.
  • 2313 Carrington Street – Rehabilitate two single family homes and construct a rear addition.

— ∮∮∮ —

2313 Carrington Street

— ∮∮∮ —

713 North 24th Street

— ∮∮∮ —

821 North 24th Street

— ∮∮∮ —

966-968 Pink Street

— ∮∮∮ —

2310 Venable Street


TAGGED: , ,

6 RESPONSES



Leave a Reply

Your email address will not be published. Required fields are marked *