visit_church_hill

Demolition continues at old Armstrong

02/22/2017 7:48 AM by

After a symbolic groundbreaking back in November, demolition was well underway by December and continues in force.

The new community on 31st Street will be replacement housing for Creighton Court, and will be mixed income, with market rate, work force, and low-income housing. The units would be configured as single-family and multifamily dwellings, with a mix of rental and owner-occupied.

The building was constructed in 1952, and closed after the the 2003/2004 school year when the student body was combined with Kennedy HS.

Scroll the “Church Hill North Neighborhood Transformation” tag for more background.

— ∮∮∮ —

— ∮∮∮ —


TAGGED: ,

5 RESPONSES



Leave a Reply

Your email address will not be published. Required fields are marked *